VINA LOGISTICS TAKES PART IN TOWING THE 3,400-TON PEDESTRIAN BRIDGE SPAN TO CENTRAL HO CHI MINH CITY
At 5:40 a.m. on October 18, the towing convoy departed from Ganh Rai Bay, setting out on a 124km voyage to deliver the main steel arch span of the Saigon River pedestrian bridge (length 187m, weight 3,400 tons) to Bach Dang Wharf. With a specialized tug fleet and experienced crews, Vina Logistics (VNL) is proud to have played a key role in this challenging yet deeply meaningful operation.
Source: Tuoi Tre – https://tuoitre.vn/bat-dau-hanh-trinh-124km-lai-dat-nhip-cau-di-bo-3400-tan-ve-ben-bach-dang-100261018024940165.htm